The construction and upgrade project for the facilities of Grupo EROFIO—a leading company in mold engineering and manufacturing based in Batalha—included the construction of a reinforced concrete pond.
As a structure designed for permanent water retention and storage, the primary challenge was ensuring absolute watertightness while preventing cracking, leaks, and continuous concrete degradation over time. To achieve this, Penetron's integral crystallization technology was selected, providing a durable, high-efficiency solution seamlessly integrated into the architectural concept of the surrounding space.